| NAME OF THE PROJECT | CONSTRUCTION OF PROPOSED DP ROAD BETWEEN TALOJA MIDC ROAD TO NH4 (OLD) UNDER EXTD. MUIP. |
| CLIENT | MMRDA |
| BASIC FEATURES OF THE PROJECT |
|
| Storm Water Drainage | LONGITUDINAL BOX DRAINS |
| Cross Drainage | BOX CULEVRTS – 7NO’S |
| Retaining Wall | 1900M |
| Utilities | LATERAL CROSS DUCTS WITH 3 PIPES @ 250M C/C |
| Scope Of Acpl | |
| Status Of Project | ONGOING |

Project Details
- Category: Roads and Bridges
- Client: MMRDA








