Roads and Bridges

The Roads and Bridges plays an important role in common man end point connectivity. We here at ACPL, Roads and Bridge division deals with consultancy projects on urban roads, greenfield corridors, sustainable pavements, bridges and highways. With best of our team of experts in dedicated sections like Innovative Material, Pavement Design, Geometric Design, Safety and Drainage Characteristics, we provide start to end advance technological support to our clients. The division uses state of art advance software such as Open Roads Designer, Civil 3D, Lumen RT, Infra Works, Auto Cad, IIT Pave, IIT Rigid and various International Pavement Design tools.

 
0 +
Road Projects
0 +
Bridge Projects

New Technologies in Focus

RAP a Sustainable Opportunity

Maintenance and Innovative Strategies

Few Glimpse From Our Projects

Ambernath Roads

NAME OF THE PROJECT CONSTRUCTION OF 18M & 24M WIDE ROAD IN AMBERNATH WEST 
CLIENT MMRDA 
BASIC FEATURES
  • GREENFIELD PROJECT
  • FOUR-LANE DIVIDED CARRIAGEWAY FOR A LENGTH OF 2.2 KM
SCOPEOF ACPL FEASIBILITY REPORT,

DETAILED PROJECT REPORT,

BID MANAGEMENT,

PROJECT MANAGEMENT SERVICES,

DEFECT LIABILITY PERIOD

ASSOCIATED MAJOR STRUCTURES MAJOR BRIDGE OF LENGTH 190M
STATUS  OF PROJECT ONGOING
  • client: MMRDA 

APMC

NAME OF THE PROJECT CONSTRUCTION OF BLACK TOP ROADS AND CC ROADS WITHIN THE APMC MARKET
CLIENT MAPMC (MUMBAI AGRICULTURE PRODUCE MARKET COMMITTEE)
LENGTH OF THE PROJECT 892 M
SERVICE ROAD 757 M
ACCESS ROAD 135M
DRAIN 890 M
SCOPE OF ACPL PAVEMENT DESIGN,

PROJECT MANAGEMENT SERVICE

  • client: MAPMC (MUMBAI AGRICULTURE PRODUCE MARKET COMMITTEE)

Badlapur Bypass

NAME OF THE PROJECT WIDENING AND CONSTRUCTION OF CC ROAD AS PER30M DP INCLUDING STORM WATER DRAIN FROM KATRAP PETROL PUMP TO KHARVAI-JUVELI OUTER RING ROAD IN BADLAPUR MUNICIPAL CORPORATION AREA (FROM CH.0+000 TO CH.3+640)
CLIENT MMRDA            
BASIC FEATURES OF THE PROJECT FOUR-LANE DIVIDED CARRIAGEWAY FOR A LENGTH OF 3.6KM
STORMWATER DRAINAGE LONGITUDINAL BOX DRAINS
SCOPE OF ACPL FEASIBILITY REPORT, DETAILED PROJECT REPORT,

BID MANAGEMENT,

PROJECT MANAGEMENT SERVICES,

DEFECT LIABILITY PERIOD

STATUS OF PROJECT COMPLETED

 

  • client: MMRDA            

Agesan Matardi Road

NAME OF THE PROJECT CONSTRUCTION OF 60M WIDE ROAD MHATRDI TO AGASAN AND CONNECTING ROAD FROM AGASAN TO KALYAN SHIL ROAD.
CLIENT THANE MUNICIPAL CORPORATION  
BASIC FEATURES
  • GREENFIELD PROJECT
  • SIX-LANE DIVIDED CARRIAGEWAY FOR A LENGTH OF 4.2KM
SCOPEOF ACPL FEASIBILITY REPORT,DETAILED PROJECT REPORT,

BID MANAGEMENT,

PROJECT MANAGEMENT SERVICES,

DEFECT LIABILITY PERIOD

ASSOCIATED MAJOR STRUCTURES ROB
STATUS  OF PROJECT ONGOING

K VILLA BRIDGE PROJECT

NAME OF THE PROJECT PROVIDING PROJECT MANAGEMENT CONSULTANCY SERVICES FOR THE WORK OF CONSTRUCTION OF MISSING LINK OVER NALLA IN BETWEEN FROM SARASWATI SCHOOL NALLA TO HOLY CROSS IN WARD NO.10
CLIENT THANE MUNCIPAL CORPORATION  
BASIC FEATURES OF PROJECT FOUR LANE CARRIAGEWAY OF 676M
ASSOCIATED MAJOR STRUCTURE VIADUCT
LENGTH OF THE BRIDGE 676M
NO OF SPAN 7.348M X 22NO’S
TYPE  OF FOUNDATION CAST IN-SITU PILE FOUNDATION OF DIA 1000M
ACTIVITIES PERFORMED FEASIBILITY REPORT,

DETAILED PROJECT REPORT,

BID MANAGEMENT,

PROJECT MANAGEMENT SERVICES,

DEFECT LIABILITY PERIOD

STATUS OF THE PROJECT ONGOING

 

  • client: THANE MUNCIPAL CORPORATION  

KBMC Phase 1 Roads

Objectives of the Maha-Abhiyan

The major objectives of the Maharashtra Suvarna Jayanti Nagarotthan Maha-Abhiyan are to provide various urban infrastructure in the urban areas of the State as per the standards prescribed by the Government, develop infrastructure facilities related to education and health as per the class of the city and enhance the social infrastructure along with aesthetic features of the cities.
Development and upgradation of the following infrastructure in the urban areas of the State will be emphasized under this Mega-Mission:

SL.NO INFRASTRUCTURE IN URBAN AREAS TO BE DEVELOPED UNDER MAHA ABHIYAN
1 KBMC OFFICE TOMIDC ROAD (L-1080M)
2 GANDHI CHOWK TO RAILWAY GATE (L-480 M)
3 GANDHI CHOWK TO TALATHI OFFICE  (L-320M)
4 GANDHI CHOWK TO SHIVAJI CHOWK (L-320M)
5 SHIVAJI CHOWK TO PRAKASH DHOTRE OFFICE (L-450M)
6 AJAY RAJA HALL TO  SAMARTH CHOWK (L-1190M)
7 MOHAN AND BRIDGE TO WALIWALI HIGHWAY (L-1310M)
8 GANDHI TEKADI TOMOHANAND BRIDGE (L-270M)
9 MOHANAND BRIDGE TO JOGGARS PARK  (L-570M)
10 RAILWAY STATION, NEW KATRAP D.P TOMIDC ROAD (L-810M)
TOTAL ROAD LENGTH                                                                                            = 6800.00M

 

NAME OF THE PROJECT CONSTRUCTION OF CC ROADS UNDER MAHARASHTRA SUVARNA JAYANTI NAGAROTTHAN MAHAABHIYAN IN KBMC AREA
TYPE OF ROADS URBAN ROADS
NO OF ROADS IN PHASE-1 10 NO’s
CUMULATIVE LENGTH OF ALL ROADS 6,800 m or 6.800 Km
SCOPE OF ACPL FEASIBILITY STUDY,

DETAILED PROJECT REPORT,

BID MANAGEMENT,

PROJECT MANAGEMENT SERVICES,

DEFECT LIABILITY PERIOD

BASIC FEATURES 4 LANES CARRIAGEWAY WITH PAVED SHOULDER
STATUS OF THE PROJECT COMPLETED

 

KBMC Phase 2 roads

Objectives of the Maha-Abhiyan

The major objectives of the Maharashtra Suvarna Jayanti Nagarotthan Maha-Abhiyan are to provide various urban infrastructure in the urban areas of the State as per the standards prescribed by the Government, develop infrastructure facilities related to education and health as per the class of the city and enhance the social infrastructure along with aesthetic features of the cities.
Development and upgradation of the following infrastructure in the urban areas of the State will be emphasized under this Mega-Mission:

SL.NO INFRASTRUCTURE IN URBAN AREAS TO BE DEVELOPED UNDER MAHA ABHIYAN
1 GANESH CHOWK, NANDGOANKAR BUNGALOW, MJPWATER TANK SHAKTI NAGAR TOMIDC MAIN ROAD (L – 1200M)
2 SAMARTH CHOWK, ARIHANT BUILDING TOBARRAGE GATE (L-860M)
3 DUBEY NALLABRIDGE, MOHAN GREENWOOD, MHATRE CHOWK, GANESH CHOWK, OMDATTA HEIGHT TOAMBERNATH-BADLAPUR ROAD (L-1320M)
4 APTE NAKA, APTE DAIRY, SHRI KRUSHNA CHOWK TO SHIRGOAN HANUMAN MANDIR (L-720M)
5 JATRAP KAMANI TO KATRAP GAON TO KATRAP VIDYALAYA TOLINK ROAD (L-670M)
6 GOKUL APARTMENT TOSAMARTH CHOWK (L-410M)
7 PRUTHVI BUILDING, SAI LEELABUILDING TO REETU WORLD APARTMENT (L-900M)
8 SAMARTH CHOWL, ULHAS RIVER BRIDGE TO HUTATMA VIR BHAI KOTVAL  CHOWK (L-2210M)
9 RAMESHWADI CHOWK, CHURCH, KRISHNA ESTATE TO DUBEY NALA BRIDGE (L-1220M)
10 AMBERNATH CHOWK NEAR AMOGH BUILDING, VASANTH NAGAR UPTO TEKADI (L-250M)
11 HUTATMA VIR BHAI KOTVAL  CHOWK, TALATI OFFICE TO CHINCHESWARI PADA CHOWK (L-960M)
12 ULHAS RIVER BRIDGE, AMBEDKAR SMARK, SONIVALI UPTOMIDC MAIN ROAD(L-1700M)
TOTAL ROAD LENGTH                                                                                            = 12340.00M
NAME OF THE PROJECT CONSTRUCTION OF CC ROADS UNDER MAHARASHTRA SUVARNA JAYANTI NAGAROTTHAN MAHAABHIYAN IN KBMC AREA
TYPE OF ROADS URBAN ROADS
NO OF ROADS IN PHASE-1 12 NO’s
CUMULATIVE LENGTH OF ALL ROADS 12,340 m or 12.34 Km
SCOPE OF ACPL
BASIC FEATURES 4 LANES CARRIAGEWAY WITH PAVED SHOULDER
STATUS OF THE PROJECT COMPLETED

 

MATHERAN

NAME OF THE PROJECT
  • IMPROVEMENT OF DASTURI MATHERAN PATHWAY WITH BEAUTIFICATION
  • IMPROVEMENT OF PARKING LOT AT DASTURI (MATHERAN)
CLIENT MMRDA 
BASIC FEATURES OF PATHWAY 5M PATHWAY WITH LATERITE PAVER BLOCKS FOR A LENGTH OF 5.7KM AND GABAION WALL FOR SOIL EROSION.
BASIC FEATURES OF PARKING IMPROVEMENT OF 13,500 SQM OF PARKING AREA WITH CONCRETE PAVER BLOCKS
SCOPE OF ACPL GEOMETRICAL DESIGN,

PROJECT MANAGEMENT SEVICES

STATUS OF PROJECT ONGOING
  • client: MMRDA
  • Location: MATHERAN

MBMC

NAME OF THE PROJECT CONSTRUCTION OF CEMENT CONCRETE ROADS IN MIRA BAINDER MUNICIPAL CORPORATION 
CLIENT MIRA BAINDER MUNCIPALCORPORATION
BASIC FEATURES OF ROAD
  • UNDIVIDED TWO-LANE CARRIAGWAY WITH SIDE DRAINS FOR 23.121KM
  • FOUR-LANE DIVIDED CARRIAGEWAY WITH SIDE DRAINS FOR 27.900 KM
  • SIX-LANE DIVIDED CARRIAGEWAY WITH SIDE DRAINS FOR 9.4KM
SCOPE OF ACPL
STATUS OF THE PROJECT ONGOING

 

  • client: MIRA BAINDER MUNCIPALCORPORATION

TALOJA

NAME OF THE PROJECT CONSTRUCTION OF PROPOSED DP ROAD BETWEEN TALOJA MIDC ROAD TO NH4 (OLD) UNDER EXTD. MUIP.
CLIENT MMRDA       
BASIC FEATURES OF THE PROJECT
  • GREENFIELD PROJECT
  • FOUR-LANE DIVIDED CARRIAGEWAY WITH PAVED SHOULDER FOR A LENGTH OF 3.3KM
Storm Water Drainage LONGITUDINAL BOX DRAINS
Cross Drainage BOX CULEVRTS – 7NO’S
Retaining Wall 1900M
Utilities LATERAL CROSS DUCTS WITH 3 PIPES @ 250M C/C
Scope Of Acpl
Status Of Project ONGOING

 

  • client: MMRDA

Matheran
Construction of Pathway in Environmentally Sustainable Zone
(Matheran Hill)

Without the application of any binding agent like cement/bitumen/lime

Badlapur Bypass
4-lane green corridor