| NAME OF THE PROJECT | WIDENING AND CONSTRUCTION OF CC ROAD AS PER30M DP INCLUDING STORM WATER DRAIN FROM KATRAP PETROL PUMP TO KHARVAI-JUVELI OUTER RING ROAD IN BADLAPUR MUNICIPAL CORPORATION AREA (FROM CH.0+000 TO CH.3+640) |
| CLIENT | MMRDA |
| BASIC FEATURES OF THE PROJECT | FOUR-LANE DIVIDED CARRIAGEWAY FOR A LENGTH OF 3.6KM |
| STORMWATER DRAINAGE | LONGITUDINAL BOX DRAINS |
| SCOPE OF ACPL | FEASIBILITY REPORT, DETAILED PROJECT REPORT,
BID MANAGEMENT, PROJECT MANAGEMENT SERVICES, DEFECT LIABILITY PERIOD |
| STATUS OF PROJECT | COMPLETED |

Project Details
- Category: Roads and Bridges
- Client: MMRDA





